O
Manitowoc
← Manitowoc

Manitowoc · issues

Civic issues

Topics getting the most attention in Manitowoc public meetings, ranked by how frequently they come up.

12 issues (filtered)14 topics
MediumWater Utilities

Storm sewer endwall repair at Waldo Blvd. and Fleetwood Dr.

A storm sewer endwall at Waldo Blvd. and Fleetwood Dr. is being repaired under a $12,900 contract with MC Excavating. It's a small but necessary fix to keep the storm drainage system working in that area.

1 mention (1 this month)Last discussed Oct 22, 2026
HighWater Utilities

Sanitary Sewer Master Plan

The city paid $27,275 to Foth Infrastructure for ongoing work on its sanitary sewer master plan — the long-term roadmap for sewer infrastructure.

4 mentions (1 this month)Last discussed Oct 8, 2026
MediumWater Utilities

Separate WPDES permit for sewer collection system

Contracts awarded to televise and reline city sewers keep the underground system in good shape and reduce future failures.

2 mentionsLast discussed Oct 1, 2026
HighWater Utilities

Private lead service line replacement financing

Residents told the council that MPU's lead service line replacement program is uneven: some homeowners got free replacements through federal/DNR funding while others on the same program are being asked to pay 50%. Speakers demanded the council push MPU to fund everyone or no one.

6 mentionsLast discussed Sep 21, 2026
MediumWater Utilities

Wastewater operations split between City and MPU

New ordinances formally codify a four-year-old arrangement where the city handles sewer pipes in the streets while MPU runs the treatment plant, with rates shown separately on bills.

1 mentionLast discussed Sep 21, 2026
LowWater Utilities

River Heights Lift Station access road repair

The city is spending $21,300.77 to rebuild the asphalt driveway easement to the River Heights Lift Station — basic maintenance of sewer infrastructure.

1 mentionLast discussed Sep 9, 2026
MediumWater Utilities

Potential Citywide IT Support for the Library

The committee eliminated the library's IT system administrator job because the city is considering including the library in a consolidated citywide IT arrangement. Members emphasized public-facing systems need same-day fixes, and if the city deal doesn't pan out, they'll amend the budget to fund support.

1 mentionLast discussed Aug 17, 2026
MediumWater Utilities

Town of Kossuth Sewer Regionalization

KSD#2's aging plant would connect to city/MPU sewers via a forcemain and gravity line, with the city paid a transfer rate. Details on rates and capacity are still being negotiated ahead of a late-September DNR grant deadline.

3 mentionsLast discussed Aug 6, 2026
HighWater Utilities

Orchard Drive / N 10th Street Flooding

Chronic flooding on Orchard Drive has stranded residents, blocked emergency vehicles, and cost the Princes a car and $20,000 in mitigation. A bigger storm sewer is planned with the 2027 N 10th Street rebuild (~$1.5 million in the five-year plan).

3 mentionsLast discussed Aug 6, 2026
LowWater Utilities

WPS Gas Facility Easement on Magnolia Avenue

Wisconsin Public Service needs a standard right-of-way easement to install gas facilities on city property along Magnolia Avenue; the committee endorsed it.

1 mentionLast discussed Jul 2, 2026
MediumWater Utilities

South 19th Street Pumping Station Rehabilitation

Two payments — about $63,285 combined — support the rehabilitation of the South 19th Street pumping station, including design work by Strand Associates. It's key sanitary/utility infrastructure for the neighborhood.

1 mentionLast discussed May 28, 2026
MediumWater Utilities

Standing-water drainage problems on Carrie Lane

Since the city's 2023 ditching project, a Carrie Lane homeowner has battled standing water and grass that won't grow in the roadside ditch. He'll now install rock at his own expense to move water away, under city grade supervision.

1 mentionLast discussed May 6, 2026