Summary
The state plans to resurface Waldo Boulevard from Fleetwood Drive to I-43 around 2034, and the city's only cost is a capped design contribution of $20,189. The agreement was signed early so design work can begin years ahead.
At a glance
- Total mentions
- 1
- Last 30 days
- 0
Last discussed Sep 3, 2026.
Impact analysis
City cost capped at $20,189 for design only; no construction cost.
Future drivers on Waldo Boulevard get a planned resurfacing, with the project secured in the state's pipeline.